Ningbo Lingkai Electric Power Equipment Co., Ltd. nbtransmission@163.com 86--15958291731
Product Details
Place of Origin: NINGBO CHINA
Brand Name: Linkai
Certification: ISO CE
Model Number: JJM5SD
Payment & Shipping Terms
Minimum Order Quantity: 1 set
Price: negotiable
Packaging Details: Wooden case
Delivery Time: 8-15 work days
Payment Terms: T/T, L/C, Western Union
Supply Ability: 100 sets / month
Model: |
JJM5SD |
Name: |
Cable Winch |
Type: |
Engine 5Ton |
Apply: |
Power Construction |
Pulling Force: |
50 Kn |
No.of Groove: |
6 |
Model: |
JJM5SD |
Name: |
Cable Winch |
Type: |
Engine 5Ton |
Apply: |
Power Construction |
Pulling Force: |
50 Kn |
No.of Groove: |
6 |
5 Ton Double Capstan Electric Engine Cabel Winch For Power Construction
5 Ton Double Capstan Electric Engine Cabel Winch For Power Construction
Mortor winch is set up high-voltage transmission lines and laying of aerial construction machinery underground cables, smooth, convenient for Tower Group legislature, set up guide (land) lines, lifting, pulling in a variety of complex conditions.The wich owns the small volume & compact structure.light weight,easy to transport.high efficiency,save labor.widely used,pulling,hoisting,lifting and so on.safe & reliable,interlock brakes system.
The double capstan electric engine cable winch is used to erecting pylon and sagging operation in line construction .
Technical Data 5 Ton Double Capstan Electric Engine Cabel Winch For Power Construction
Model | JJM-5SD | |||||
Engine | Electric | |||||
Power | 6.3KW,3600rmp | |||||
Suitable Wire Rope(mm) | 15 | |||||
Bottom diameter of Groove(mm) | 240 | |||||
No.of Groove | 6 | |||||
Gear | Forward | Reverse | ||||
SlowⅠ | SlowⅡ | FastⅠ | FastⅡ | Slow | Fast | |
Pull Force(KN) | 50 | 30 | 13 | 10 | No lifting | No lifting |
Speed(m/min) | 6 | 10 | 23 | 30 | 5 | 17 |
Weight(kg) | 280/300 | |||||
Dimension(mm) | 1330*800*600 |
Engine use and maintenance, according to the machine instructions. Lifting shall not exceed in line with use.Lubricating oil surface must be kept within 1/4.gearbox, before using the machine outside the bearing should add oil.After the long-distance transport aircraft, before use, must be a detailed examination of the various components fastening screws loose, ministries parts is stagnant leak. Gearbox ZL4 aluminum body with screws on it should not be too tight and unnecessary disassembly, but can not use a hammer.
Our Service:
High quality fasteners products with best price;
Many years excellent experience with pre-sale and after-sale service;
Strict quality control according to your requirement;
Professional packing team keep every pack safely;
Send you some free samples along with your cargo to share us quality;